N7L1-1835 - GNWT - Department of Transportation
Numéro de licence
N7L1-1835
Entité de licence
GNWT - Department of Transportation
Statut de la licence
Expired
Type de licence
Industrial
Remarques
Inuvik - Tuktoyaktuk Highway (ITH) kilometre post 0 at the end of Navy Road (Lat 68D 25M 2.857S N, Lon 133D 46M 31.172S W) and kilometre post 119at the junction of the Tuktoyaktuk to Source 177 Access Road (Lat 69D 16M 21.059S N, Lon 132D 54M 11.131S W) - Construction of the Inuvik - Tuktoyaktuk Highway Project Type A water licence with term December 12, 2013 to December 11, 2023.
Reasons for Decision
Water Licence
Water Licence Expiry Reminder
2013-07-15 EISC Letter of Exemption
2013-07-23 Other EISC Letters of Exemption
2013-06-14 Application for Water Licence
2013-06-14 Application for Water Licence (revised)
2013-06-20 Additional Submission Consultation pkg
2013-06-27 Receipt of Application and Review Process
2013-07-03 Completeness and Notice of Application
2013-07-09 Response to Completeness and Notice of Application
2013-07-15 Information Request #1
2013-08-02 Information Request #2
2013-08-06 Request for Extension (IR #2)
2013-08-06 Response to Request for Extension (IR #2)
2013-08-06 Technical Response to IR #1
2013-08-12 Response to IR #1
2013-08-15 Response to IR #2
2013-08-27 NWTWB Response to IRs #1 and #2
2013-08-30 Response to NWTWB Aug. 27/13 Letter
2013-09-05 Additional Information IR #1 and #2
2013-09-10 NWTWB Response to Additional Info IR#1 and #2
2013-09-13 Erratum Additional Information IR #1 and IR #2
2013-09-19 Letter to Inuvik Hunters and Trappers Committee
2013-09-19 Letter to Tuktoyaktuk Hunters and Trappers Committee
2013-09-20 IGC Request for Intervener Status
2013-09-23 NWTWB Response to IGC Letter
2013-09-23 NWTWB Response to IGC Request for Intervener Status
2013-09-24 IHTC Water Licensing Proceeding for ITH
2013-09-24 NWTWB Response to Inuvik Hunters and Trappers Committee
2013-09-27 DOT Additional Submissions
2013-09-27 Inuvialuit Game Council Submission
2013-09-28 FJMC Request for Intervener Status
2013-09-30 NWTWB Response to FJMC Request for Intervener Status
2013-10-31 Information Request
2013-11-03 Response to Information Request
2013-11-04 Response to Information Request (October 31/13)
2013-11-07 Revised Response to Information Request (October 31/13)
2013-11-20 NWTWB ITH Work Plan (Revised)
2013-0704 Request for Review of Application and Comments
2013-07-30 Review of Application and Comments
2013-10-28 Request for Comments on Draft Licence
2013-11-04 Comments on Draft WL
2013-11-04 AANDC Additional Comments on Draft WL
2013-11-05 NWTWB to Reviewers Regarding Late Submission by AANDC
2013-11-07 Reviewers to NWTWB Regarding Late Submission by AANDC
2013-11-13 Decision on Late Submission by AANDC
2013-2014 Annual Report
2013-2014 Annual Report - Revised
2014-07-16 IWB Response to 2013-2014 AR
2014-09-08 IWB Response to Revised 2013-2014 AR
2014-10-10 DOT Response 2013-2014 AR
2014-2015 Annual Report
2015-08-12 IWB Response to 2014-2015 AR
2015-10-15 DOT Response to 2014-2015 AR
2015-2016 Annual Report
2016-07-26 IWB Response to 2015-2016 AR
2016-08-08 DOT Response to 2015-2016 AR
2016-08-11 IWB Acknowledgment - 2015-2016 AR
2016-2017 Annual Report
2017-08-22 IWB Add Info Request - 2016-2017 AR
17-10-06 2016-2017 AR - Revised
2017-11-10 2016-2017 AR - Acknowledgment
2017-2018 Annual Report - Part 1
2017-2018 Annual Report - Part 2
2018-10-02 Annual Report 2017-2018 - Add Info Request
2018-10-11 AR 2017-2018 - INF Add Info Submission
2019-04-12 AR 2017-2018 Revised - Part 2
2019-04-12 AR 2017-2018 Revised - Part 3
2019-04-12 AR 2017-2018 Revised - Part 1
2019-04-24 AR 2017-2018 Acknowledgment
2019-07-17 AR 2018-2019 Reminder
2020-04-16 AR 2018-2019 - Part 1
2020-04-16 AR 2018-2019 - Part 2
2020-04-16 AR 2018-2019 - Part 3
2020-05-14 AR 2018-2019 and SNP - Acknowledgment
2020-06-30 AR 2019-2020
2020-07-07 AR 2019-2020 Add Info Request
2021-04-26 AR 2019-2020 Revised
2021-05-05 AR 2019-2020 Acknowledgment
2021-06-29 AR 2020-2021
2021-07-08 AR 2020-2021 Add Info Request
2021-08-31 AR 2020-2021 INF Response to IWB Add Info Request
2021-09-10 AR 2020-2021 Acknowledgment
2022-06-29 AR 2021-2022
2022-07-27 AR 2021-2022 Add Info Request
2022-2023 Annual Report
2022-2023 Annual Report - Acknowledgment
2014-10-31 1835 SNP Results
2014-11-10 1835 SNP Results
2015-07-10 ITH SNP Lab Results
2016-03-10 Notice to Water Crossing Coordinates Changes
2016-07-19 ITH SNP Lab Results
2016-08-26 ITH SNP Lab Results
2016-10-27 DOT response on SNP sampling 312 and GSC4
2016-11-02 ITH SNP Lab Results
2017-04-28 N7L1-1835 DOT Response on April18, 2017 IR
2017-07-07 ITH SNP Lab Results
2017-08-11 ITH SNP Lab Results
2017-09-08 ITH SNP AEMP sampling delay_Sept 8 2017
2017-09-12 ITH SNP Lab Results
2017-11-06 ITH SNP Lab Results
2017-11-22 ITH Inspection Report
2018-02-20 N7L1-1835 ITH SNP - 2017 Monitoring -Add Info Request
2018-02-27 N7L1-1835 ITH SNP 2017 Monitoring -INF Response on IWB letter Feb 20, 2018
2018-07-11 N7L1-1835 ITH SNP Lab Results
2018-07-13 N7L1-1835 ITH SNP Sampling Delay
2018-08-15 N7L1-1835 DOT-ITH SNP Lab Results
2018-09-21 N7L1-1835 DOT-ITH SNP Lab Results
2018-09-21 N7L1-1835 DOT-ITH SNP Sampling Dealy Notification
2018-11-02 N7L1-1835 ITH SNP Results
2018-11-06 N7L1-1835 ITH Inspection Report
2018-11-26 ITHCWG SNP and Aquatic Effects Monitoring Program
2019-05-31 N7L1-1835 ITH - Inspection Report
2019-08-02 N7L1-1835 INF-ITH SNP Lab Results
2019-10-11 N7L1-1835 ITH 2019 SNP Results - Add Info Req
2020-04-16 N7L1-1835 GNWT -ITH 2019 SNP Report
2020-11-06 N7L1 1835 INF ITH Insp Rep
1835 IR February 14, 2014
1835 IR March 6, 2014
1835 IR April 14, 2014
1835 IR May 20, 2014
1835 IR June 13, 2014
1835 IR November 10, 2014
1835 IR December 01, 2014
1835 IR December 03, 2014
1835 IR December 16, 2014
1835 IR January 6, 2015
1835 IR January 7, 2015
1835 IR January 15, 2015
1835 IR February 3, 2015
1835 IR February 6, 2015
1835 IR February 17, 2015
1835 IR March 5, 2015
1835 IR March 12, 2015
1835 IR March 20, 2015
1835 IR March 31, 2015
2016-01-20 Inspection Report
2016-01-22 Inspection Report
2016-02-04 Inspection Report
2016-02-12 Inspection Report
2016-02-25 Inspection Report
2016-03-04 Inspection Report-N
2016-03-08 Inspection Report South End
2016-04-11 Inspection Report-S
2016-04-12 Inspection Report-N
2016-05-05 Inspection Report-N&S
2016-05-13 WRO Sample Results- May 5, 2016 Inspection
2016-05-05 Inspection Report-N&S
2016-06-02 DOT Response on Inspection Reports
2016-06-06 DOT Response on Inspection Report
2016-06-14 Inspection Report-N&S
160831 Inspection Report- Borrow Source 174
2016-10-18 DOT Response -Source 174 Sinkhole Inspection
2016-11-25 Inspection Report-N&S
2017-02-15 Inspection Report (ITH N&S)
2017-03-02 Inspection Report-N&S(ITH)
2017-03-16 Inspection Report (ITH)
2017-03-29 Inspection Report (ITH)
2017-04-18 ITH Inspection Report
2017-05-05 Inspection Report (ITH)
2017-05-17 Inspection Report (ITH)
2017-06-01 WRO follow-up on IR
2024-05-23 Inspection Report
1835 PD 2013 Cover letter - 130614
1835 PD 2013 Main Report - 130614
1835 PD 2013 Appendix A - 130614
1835 PD 2013 Appendix B - 130614
1835 PD 2013 Appendix C - 130614
1835 PD 2013 Appendix D - 130614
1835 PD 2013 Appendix E - 130614
1835 PD 2013 Appendix E - 130614
1835 PD 2013 Appendix G - 130614
1835 PD 2013 Appendix H - 130614
1835 PD 2013 Appendix I - 130614
1835 Notice of Pre-Hearing Conference - 130812
1835 Notice of Public Hearing - 130823
1835 Pre-Hearing Conference Agenda - 130916
1835 Pre-Hearing Conference Questions - 130916
1835 AANDC PHC Follow-up - 130918
1835 Pre-Hearing Conference Minutes - 130918
1835 Invite to THTC to Attend PH - 130919
1835 Invitation to IHTC to Attend PH - 130919
1835 Supplemental Responses to PHC Questions - 130920
1835 IGC App to Intervene - 130920
1835 Response to IGC App to Intervene - 130923
1835 NWTWB AANDC Participation in Public Hearings - 130924
1835 ILA Participation in Public Hearings - 130924
1835 AANDC Participation in Public Hearings - 130927
1835 DOT Public Hearing Presentation - 130927
1835 FJMC App to Intervene - 130928
1835 Response to FJMC App to Intervene - 130930
1835 Public Hearing Agenda - 131001
1835 IGC Public Hearing Presentation - 131003
1835 FJMC Public Hearing Presentation - 131007
1835 Inuvik Public Hearing Transcripts - 131007
1835 Tuktoyaktuk Public Hearing Transcripts - 131008
1835 test - 131017
1835 Submission as per terms of licence - 131220
1835 As per Terms and Condition of WL- 140110
1835 Response to IWB Mar. 2614 Letter -140428
1835 IWB response - April 28 14 submissions - 140515
1835 Response to IWB May 15, 2014 Letter - 140602
1835 AEMP Revised - 140613
1835 Recent Results of SNP - 140627
1835 IWB Response to AEMP-SNP June 13 submission - 140711
1835 GNWT Response to IWB AEMP-SNP- 140716
1835 IWB response - June 2014 SNP July 16, 2014
1835 IWB response - July AEMP - SNP - 140717
1835 DOT Response IWB Jul.17 IR AEMP-SNP - 140723
1835 IWB Approval of AEMP-SNP - 140725
1835 Source 170 Revised EMP - 140805
1835 Source 177 Revised EMP - 140805
1835 Source I401A Revised EMP - 140805
1835 Preliminary Closure Reclamation Plan - 140815
1835 Updated SNP Result June 2014 - 140815
1835 Source PW 10-11 EMP Mar 1st 2014 - 140902
1835 IWB Response June SNP Additional Info - 140908
1835 IWB response PCRP - 140908
1835 Approval of EMP Revised -140915
1835 Source 170 Perimeter Breach - 140916
1835 Notice Source 170 Perimeter Breach - 140922
1835 IWB response source 170 perimeter breach - 140923
1835 IWB to ENR source 170 Perimeter Breach - 140923
1835 Mapping for Water Sampling Locations - 140924
1835 DOT Response to Sept. 8 and Construction Schedule - 140930
1835 Notice of Late Sampling for September - 141014
1835 DOT SNP Response to IWB - 141015
1835 IWB Response to SNP - 141020
1835 SNP Results - 141031
1835 SNP Results - 141110
1835 Adaptive Management Framework - 141117
1835 IWB Response to Adaptive Mgmt Framework - 141118
1835 Pit Development Plans Source 173-174-305 - 141127
1835 Adapative Mgmt Framework - 141212
1835 Fisheries Management Plan - 141212
1835 IWB Response to Source 173-305-174 PDP - 141212
1835 IWb Response to AMF - 141217
1835 Response to IWB December 12, 2014 Request - 150319
1835 Notice of Plan Changes for Water Crossings - 150326
1835 Approval of Source 174 Pit Development Plan - 150402
1835 Acceptance of Plan Changes for Water Crossings - 150407
1835 SNP-AEMP Annual Sampling - 150515
2015-10-08-FJMC Letter to EIRB
1835 Winter Construction Schedule - 151119
2016-01-22 DOT letter to IWB with update on modifications
2016-01-22 DOT Construction Atlas - Revised
2016-01-27 IWB Response to DOT 2016-01-22 letter
2016-01-29 PDP Submission letter Sources 312 West and GSC 4
2016-02-03 PDP Source 312West Final
2016-02-03 PDP 312 West Appendix A Construction Plan
2016-02-03 PDP 312 West Appendix B-2 Granular Materials Inventory
2016-02-03 PDP 312 West App C Archaeological Site Management Plan
2016-02-03 PDP 312 West Appendix B-1 Geotech Investigation
2016-02-03 PDP Source GSC4 Final
2016-02-03 PDP Source GSC 4 App A Construction Plan
2016-02-03 PDP Source GSC 4 App B Geotech Report
2016-02-08 PDP Source 312 West add info req
2016-02-08 PDP Source GSC 4 add info req
2016-02-24 DOT Respnse to IWB 2016-02-08 add info req - GSC 4
2016-02-24 DOT Response to IWB 2016-02-08 add info req - 312 West
2016-02-24 DOT Response to IWB 2016-01-27 letter
2016-02-29 IWB Response to DOT 2016-02-24 letter
2016-03-01 IWB Response to DOT 2016-02-24 letter - 312 West
2016-03-01 IWB Response to DOT 2016-02-24 letter - GSC 4
2016-03-04 Notice of Operational Change of Source GSC 4
2016-03-07 Notice of Operational Change of Source 312
2016-03-10 Notice to Water Crossing Coordinates Changes
2016-04-04 DOT Letter - Modifications
2016-04-04 DOT letter - 312 West
2016-04-04 DOT Letter - GSC4
2016-05-05 DOT Letter & IFC Embankment Part-1
2016-05-05 IFC Embankment Part-2
2016-05-05 IFC Embankment Part-3
2016-05-05 IFC Embankment Part-4
2016-05-05 IFC Embankment & Adjusted Culverts Part-5
2016-05-10 ITH Commitment Table - Working Copy
2016-05-12 Correspondence and Plan-ESC
2016-05-15 IWB Acceptance - Modifications
2016-05-26 DOT Response -Modifications
2016-08-15 DOT ITH Updated PDP 312 West
2016-08-15 DOT ITH Updated PDP 312 West
2016-08-15 DOT ITH Updated PDP 312 West-Appendix B2 and C
2016-08-16 IWB Letter-Updated PDP Source 312
2016-10-27 DOT Response-SNP Source 312 and GSC4
2016-10-28 Winter Construction Schedule 2016-2017
2016-11-18 Updated Winter Cons Schedule
2016-11-18-Granular Results Pit 312 and GSC4
2017-03-01 DOT Response - Pit 174 Sinkhole
2017-05-09 Impact Mitigation Measures - Design Change
2017-05-10 IWB Response to May 8, 2017 DOT submission
2013-01-31 ITH Land Type and Desin Brief - Ground Thermal Analysis
2013-09-04 ITH_Design_Report
2013-12-27 ITH Emergency Response Management Plan
2016-02-25 GNWT_DOT letter to IWB_GSC4_2016 02 24
2016-05-15 N7L1-1835_Ltr to DOT re Notice of Modifications
2016-05-27 DOT Response – Modifications Response
2016-05-27 DOT Response – Modifications Response
2017-08-18 N7L1-1835 ITH PW10 sediment measures
2018-02-28 N7L1-1835 INF Res on Long Term Impact Design Change
2018-05-04 IWB Resp - Emb Hght reduction
2018-06-11 ITH Pit PW10 Sediment Spill Report
2018-07-04 N7L1-1835 - INF request for reports submission deadline exten
2018-07-06 N7L1-1835 ITH - Reports submission Extension
2018-09-05 N7L1-1835 ITH - INF Submission Extension Request
2020-12-09 N7L1-1837 ITH Submission - Reminder
2013-12-23 Inuvik Waste and Sewage Acceptance Letter
2013-12-23 Tuk Waste and Sewage Acceptance Letter
2013-12-27 ITH Explosives Management Plan
2014-01-20 Spill Contingency Management Plan
2014-01-20 Fish and Fish Habitat Protection Plan
2014-01-20 ITH Permafrost Monitoring Plan
2014-01-20 ITH Wildlife and Wildlife Habitat Protection Plan
2014-03-31 ITH Sediment and Erosion Control Plan- Final
2014-04-25 Waste Management Plan
2014-05-15 IWB response - April 28 14 submissions
2014-07-24 ITH AEMP-SNP July 24 2014(final version)